industrial training report for electrical engineering students53 days after your birthday enemy
industrial training report for electrical engineering students
Weve updated our privacy policy so that we are compliant with changing global privacy regulations and to provide you with insight into the limited ways in which we use your data. I had follow Ms Athirah to do corrective maintenance for the bedside guide rail at the ward. Pressthe print key to verify that the paper is loaded correctly. Bookmark not defined. 3 Street Lighting Sungai Petani Figure 5: Syed Khairol Anuar bin Syed Abidin, AMK, BCK Yang DiPertua Majlis Perbandaran, Figure 7: Typical Feeder Pillar for Street Lighting, Figure 8: Internal Components in Feeder Pillar, Figure 9: Internel Structure and Components of Feeder Pillar, Figure 10: Time switch, MCB for controlling Devices, 3P 63A contactor, MCB, and neutral, Figure 15: Three pole (3P) Mounded Case Circuit Breaker (MCCB), Figure 16: Three pole 240V 100A contactor, Figure 19: Thermal relay Figure 18: Auxilliary contact, Figure 20: Single arm spigot flanged type street lamp. Additionally, the 25-A-device receptacle allows for testing of thosedevices that need it, so the technician is not limited to only test 15-A equipment.4.2.1.2 ESA 615 FLUKE Figure 4.2.1.2 ESA 615 FLUKEThe ESA615 Electrical Safety Analyzer brings fast and simple automated testing inthe form of a portable analyzer to healthcare technology professionals that performelectrical safety testing on medical equipment both in the field and in facilities.Whether it is simple testing or comprehensive analysis, the ESA615 can do it all. service, site visit with their supervisor, and etcetera. They have spent the last two years in gaining theoretical knowledge of various manufacturing and assembly processes. Shall so conduct himself/herself so as not to interfere with the wellbeing of otherpatients or providers of healthcare of facilities.6. Press the main screen keyto close the menu.Enabling automatic NBP printouts.Open the blood pressure menu and touch the auto print NBP check box to selectthe enable and disable auto print setting. SHOW ALL Mechanical Engineering Chemistry Environmental Science and Sustainability Physics and Astronomy Research Methods Earn Your Degree This is the report on industrial trining in DLW Varanasi. 2.4. KPJ Johor isbacked by a comprehensive range of Specialists and Sub-specialists together with a24-hours Accident & Emergency Services and a bed capacity of 268 beds.With 40 years of experience to date, KPJ Johor excels in multiple self-developed andcollaborative Centre of Excellences in Radiotherapy & Oncology Centre, CardiacCentre, IVF Centre (Monash IVF KPJ).KPJ Johors clinical side is also backed bystate-of-the-art technologies & systems, various supporting services, and continuouslyimproved environment and facilities to provide holistic healthcare services. machines, air conditioners, punch machines, photocopy machines, etc. So that, the communicationskills are very importance in work. I am passionate about engineering, research, entrepreneurship and using my skills to solve challenges faced on the African continent. Exposure that was given to me at this firm can provide the picture on a real-life situation,the task and responsibility that would be carried by some people on the field. Ensure the safety of the student on every practical work that is been assigned to them. Figure 3.5.1 PPM of Laser Therapy Machine 18All the probe and laser probe have be test and checked , the applied parts are in goodcondition same like the machine and the all test input and output value. Students should have completed required elective modules to be better Copyright 2023 StudeerSnel B.V., Keizersgracht 424, 1016 GC Amsterdam, KVK: 56829787, BTW: NL852321363B01, Essential Surgery (Clive R. G. Quick; Joanna B. Reed), Clinical Medicine (Parveen J. Kumar; Michael L. Clark), Lecture Notes: Ophthalmology (Bruce James; Bron), Diseases of Ear, Nose and Throat (P L Dhingra; Shruti Dhingra), Oxford Handbook of Clinical Medicine (Murray Longmore; Ian Wilkinson; Andrew Baldwin; Elizabeth Wallin), Clinical Examination: a Systematic Guide to Physical Diagnosis (Nicholas J. Talley; Simon O'Connor), Gynaecology by Ten Teachers (Louise Kenny; Helen Bickerstaff), Little and Falace's Dental Management of the Medically Compromised Patient (James W. Little; Donald Falace; Craig Miller; Nelson L. Rhodus), Browse's Introduction to the Symptoms and Signs of Surgical Disease (John Black; Kevin Burnand), Apley's System of Orthopaedics and Fractures, Ninth Edition (Louis Solomon; David Warwick; Selvadurai Nayagam), Shigley's Mechanical Engineering Design (Richard Budynas; Keith Nisbett), Law of Torts in Malaysia (Norchaya Talib), Apley's Concise System of Orthopaedics and Fractures, Third Edition (Louis Solomon; David J. Warwick; Selvadurai Nayagam). The Company also offers expertise in allied contracting activities such as electrical, plumbing, fire-fighting and industrial projects, in order to offer turnkey solutions, apart from execution of . Submitted in partial fulfillment of the We had changed it with the new battery. Each student must have his/her own one report copy irrespective the project work has been done in a . INDUSTRIAL TRAINING REPORT.docx - Free download as Word Doc (.doc / .docx), PDF File (.pdf), Text File (.txt) or read online for free. Basaveshwar Engineering College, Bagalkot. Industrial Training is meant to expose the students of engineering of the actual Industrial Processes about which they have mean studying in detail from their semesters. ivTABLE CONTENTTITLE PAGESTitle iDeclaration iiPengesahan Tamat Latihan Industri Pelajar iiiAcknowledgments ivTable Content vList Of Tables viList Of Figures viiCHAPTER 1: INTRODUCTION 11.1 Introduction Industry Training 21.2 Objective of Industry Training 31.3 Importance of Industry TrainingCHAPTER 2: BACKGROUND OF INDUSTRIAL TRAINING PLACE 42.1 Introduction 4 5 2.1.1 Profile Company 6 2.1.2 Vision, Mission, Core Values 7 2.1.3 Patients Right & Responsibility 8 2.1.4 KPJ Johor Emblem 8-9 2.1.5 Brand Signature 10 2.1.6 Location 112.2 Organization Chart 112.3 Organization Information 12 2.3.1 Biomedical Organization Structure 122.4 Department Function 13 2.4.1 Head of Services 14 2.4.2 Unit Manager 2.4.3 Medical OfficerCHAPTER 3: SUMMARY OF IDUSTRIAL TRAINING ACTIVITIES 153.1 Introduction 16-243.2 Summary of Industrial Training ActivitiesCHAPTER 4: TECHNICAL SYSTEM 254.1 Introduction 254.2 Planned Preventive Maintenance (PPM) 26-28 26 4.2.1 Specifications Tools for PPM and EST Test 26 4.2.1.1 ESA 620 FLUKE 27 4.2.1.2 ESA 615 FLUKE 27 4.2.1.3 Rigel 2888+ Electrical Safety Analyzer 28 4.2.1.4 ProSim 4 Vital Sign and ECG Simulator 28 4.2.1.5 ProSim 8 Vital Sign and ECG Simulator 29 4.2.1.6 ProSim SPOTLiGHT SPO2 Pulse Oximeter Analyzer 29 294.3 Unplanned Maintenance4.4 Emergency Breakdown 4.4.1 Breakdown Tools Kit vTITLE PAGES4.5 Beyond Economic Repair (BER) 294.6 Testing and Commissioning (T&C) 304.7 Operation of Vital Sign 4 Monitor 30 30 4.7.1 Introduction 31-32 4.7.2 Label of Function 33 4.7.3 Procedure of Vital Sign 4 34 4.7.4 Common Problem of Vital Sign 4 35-36 4.7.5 Planned Preventive Maintenance (PPM) Vital Sign 37 4.7.6 Breakdown Vital Sign 4 38CHAPTER 5: RECOMMENDATIONS AND IMPROVEMENTS 395.1 Findings5.2 Recommendations 40CHAPTER 6: CONCLUSION 416.1 Conclusion 42REFERENCES 43 44APPENDIX 1: PPM RESULT OF GASTROSCOPY 45APPENDIX 2: T&C DOCUMENTS 46APPENDIX 3: MAINTENANCE REQUEST FORM 47APPENDIX 4: WORK PASS APPLICATION FORM 48APPENDIX 5: REQUISITION FORM FOR SERVICE/REPAIRAPPENDIX 6: WORKPLACE MANAGEMENT SYSTEMAPPENDIX 7: ACTIVITIESviLIST OF TABLESTABLE PAGESOrganization chart 10Biomedical organization structure 11Head of Services 12Unit Manager 13Medical Officer 14Label of function of SureSign VS4 Monitor 31-32 viiLIST OF FIGURESFIGURE PAGES2.1.1 KPJ Johor Specialist Hospital Building 52.1.4 Logo KPJ Johor 82.1.6.1 KPJ Johor Specialist Hospital Main Entrance 92.1.6.2 KPJ Johor Maps 103.1 KPJ Johor Outpatients Building 163.1.1 Cot side rail patients bed LKL 173.2.1 T&C warmer unit machine, ATOM 183.3.1 PPM of humidifier Ventilator AVEA using Rigel analyzer 183.4.1 ECG waveform not stable and ECG simulator to calibration 193.5.1 PPM of Laser Therapy machine 193.5.2 PPM of Shockwave therapy machine 203.7.1 Oxygen sensor of GA machine 203.9.1 PPM of Tympanometer 213.10.1 Change the side connecter of warner unit 213.12.1 Fuse changing of VSU monitor 223.14.1 EPOC machine 233.15.1 Voltage Stabilizer problem 233.16.1 Site visit of Linac replacement 244.2.1.1 ESA 620 FLUKE 264.2.1.2 ESA 615 FLUKE 264.2.1.3 Rigel 288+ Electrical Safety Analyzer 274.2.1.4 ProSim 4 Vital Sign and ECG Simulator 274.2.1.5 ProSim 8 Vital Sign and ECG Simulator 284.2.1.6 ProSim SPOTLight Spo2 Pulse Oximeter 284.4.1 Breakdown tools 294.7.1 SureSign VS 4 monitor 304.7.3 Basic Operations of SureSign VS4 monitor 33 viiiCHAPTER 1 INTRODUCTION1.1 INTRODUCTION OF INDUSTRY TRAININGThe industrial training compulsory for every student Diploma in ElectronicEngineering (Medical) as a condition for the award of the diploma. Vendor had do the EST test for IEC62353, CLASS I for laser machine andCLASS II for shockwave machine. The value of respect for those around him will arise within the student if the students Industrial Training heartfelt and sincere. Right to acceptable health care and to be treated with respect and dignity withinsurrounding of reasonable privacy2. many other aspects of town growth and well-being in Sungai Petani and Kuala Muda. The ECG machine had calibratedto the low frequency to get the stable waveform.Figure 3.4.1 ECG waveform not stable and the ECG simulator to calibrated thewaveform.WEEK 5 ( 5 APRIL 2021 10 APRIL 2021)I had attend the PPM of shockwave machine and laser machine at physioterapy withvendor. Vendor had do EST test to the tympanometer and had do the performancetest to the tympanometer. Industrial Training Report 2021 - LM.UiTM(O). 18 /0 7 - StuDocu They will increase their understandingofproccessed based audits and risks based things. students and teachers can enhance their character and professional skills. Blessings and Peace be upon the Prophet Muhammad S.A.W, hisentire family, and his companions. Electrical Safe Work Practice. Click here to review the details. Electrical Engineering Electrical Engineering signal processing, then move on to advanced subtopics such as microelectronics, telecommunications, and power and control engineering. Electrical Engineering Industrial training-in-chandigarh Mohali 83, no. I had learned how the cycle of Biomedical Engineering life cycle. Student also needs to be politeand honest during the internship. Both machine are in good condition. FACULTY OF ELECTRICAL ENGINEERING (FKE) INDUSTRIAL TRAINING TECHNICAL REPORT SPECIFIC GUIDELINES FOR ALL FKE STUDENTS BEKG/BEKM (BEKU3695) & DEK (DEKU3118) Objective: One of the objectives of industrial training is to train students to prepare a technical report after completing their industrial training session. Student also need to practice beingmore friendly and not shy for asking if get any questions so that it is easy to acquireknowledge. The students are required to pass before the Industrial Training is recommended for award of a diploma at any school. I can use all this experience as my preparation for the real work in thefuture. 23WEEK 19 ( 12 JULY 2021 17 JULY 2021)I had updated all my jurnal report and jurnal refleksi for 20 weeks during internship atKPJ Johor based on group breakdown updated. REPORT: Format of the report is according the sample format. DLW Electrical Engineering industrial training Report - SlideShare All the institutions of higher learning in Malaysia that offer Engineering programmes have this requirement in their curriculum. Bookmark not defined. Discover the best professional documents and content resources in AnyFlip Document Base. FACULTY OF ELECTRICAL ENGINEERING maintenance works for infrastructures and public facilities, project site inspections, Morerver, I had dothe payment certificate for PPM with my supervisor for medical equipment at KPJJohor. So quite easy and convenient to carry out the work which will be given later. Figure 28 Typical connection detail of streetlamp .. Error! More responsibility is placed on students with project reports than with lab reports. Sorting of some products that is needed to be disbatched. f) Linking theory to practice and so on. Other than that, I suggest tostudent for choose their internship place as close as they can with house for avoid thecosting during internship. approved plan. defined. Each assigned task must follow processes and procedures that have been setit carried out in stages. This Industrial training report presents the experience garnered during my 6 months of industrial training undertaken at Special Gift Technical Services, Gudu district Abuja. We've updated our privacy policy. In the end of the Industrial Training, students are able to: Apply ethics and professional electrical engineering practice in working environment. 2.3 Relationship of the Training to Course of Study; The related experience to the course of study is that of the practical work executed during the training which is based on employee interaction and general/staff satisfaction to achieve aims and objectives of the Company. To get more targeted content, please make full-text search by clicking. S. Famliy Law II - Konsep domisil dalam undang-undang keluarga dan beban bukti pertukaran domisil. For instance, perfusion online data system, weighing scalebed (ICU), patient monitor (ICU), Urodynamic Machine, Stress Test System, and HighNasal Flow machine.WEEK 12 ( 24 MAY 2021 26 MAY 2021 )Change the fuse of vital sign 4 at the dialysis centre. Yang DiPertua Majlis Perbandaran Sungai Petani, MPSPK leadership is leaded by a chairman whose will be in charge for 2 years before replaced Do not clean electrical contacts or connectors with bleach. We had change the new adapter and wait part ofthe stand from the supplier. As a traineeI was educated for do my duties with honesty and trust because this value will give thequality work of ones work and ones trust in us. 8) Use the analog to control the main screen. Matriculation Number. Green I had also do the quarantin for 2 days and get the result onFriday, 28hb May 2021. To upgrade the quality of public facilities and infrastructures for the convenience Mohd Izdiharudin Ibrahim. This breakdown is my first case attempt bymyself and I had learned and follow the all prosedure like biomed techinician areshowed to me. by new chairman for every 2 years, Implement small projects of the council through quotation, Resolve public complaints related to roads, drainage and others departmentally, Install tent equipment for governmental official functions, Assist other agencies related to natural disasters, Monitor the tender special projects provided by the ministry of housing and local Year of Study, i.e. d) To make students do not face any difficulty or clumsy when start working soon. Figure 29: Cable laid direct in ground laying detail . Error! Bookmark not defined.
High Quality Zapruder Film Frame 313,
Correct Way To Hang Union Jack Vertically,
Articles I